While it may not look like much today, there’s been a lot done.
We took possession of this Duplex at 2728-2730 El Caprice, Rancho Cordova on February 27th.
To date, we’ve got the hardwood floors installed in all the high traffic areas, the tile floors in the entry and all the bathrooms, holes in the ceilings and walls repaired and installed the new base boards.
We’ve taped and textured, installed the new sliders to the back yards and have started the interior painting.
In addition, we’ve laid some concrete down to enhance the size of the patios and we’ve squared off the exterior areas as you’ll see in the video. We will be doing some nice things in the landscaping department which is something a lot of investors overlook in my opinion.
[kml_flashembed movie=”http://www.youtube.com/v/EyItLKihQOE” width=”318.75″ height=”262.5″ wmode=”transparent” /]
To See Where We Started From, CLICK HERE for the beginning video and the 1st update that was done I think on the 1st of March.
In the mean time…?
Make it a Great Day..!
Ed Favinger, Broker CRS, GRI, SFR 916-203-1260 favinger@rwnetwork.com
Related articles
- Various Facts About Hardwood Flooring (foodstaycation.com)
- Profile of a “Flip”… I”ve Got Before & After Video (theycallmemred.com)
Leave a Reply